Exercise No. 9: Creating a Bill of Material (BOM)

Transfer the following verbal description into an EPC

a) The product manager creates a new BOM by specifying the material number, the usage and the validity period.

b) Thereafter the product manager enters the BOM components: each component to be entered is given an item number (10, 20, 30.), a component number, a quantity and a validity date.

c) The components are assigned to the BOM: either the operation from routing is assigned or the object dependencies are entered or the BOM item is classified or any combination of the BOM item assignments.

d) The controlling department enters the BOM header data (BOM group is determined, status is set and base quantity is entered). Finally the BOM is saved.