Exercise No. 30: PPC System

Transfer the following verbal description into an ERM

a) The materials (Mat-#) are connected by hierarchical bill of materials structure.

b) On a technical level work centres (Wrk-#) are used in routings (RO-#) as a routing step. Materials are produced by routings, whereas, a routing is uniquely assigned to the material it produces; each routing step refers to the materials that are used.

c) Cost planning is defined as a combination of cost centres (CC-#), activities (Activity-#) and periods (P-ID).

d) Each work centre is uniquely assigned to the combination cost planning.