Studierende stehen vor dem LC und blicken lächelnd einer Kollegin mit einer Mappe in der Hand nach.

Change Period

Before the scorecard can be defined in detail, we need to change the period for which it is valid. As the initial period is default set to the current date, we need to specify that the desired initial period is January 2004 (format: 001.2004).

Path: SAP menu/Strategic Enterprise Management/Strategy Management/Design > Scorecard Design > Scorecards

For more details, see

  • Chapter 2.3.3.1 'Determination of the General Scorecard Structure', page 65

Hint: Unfortunately you need to set the initial period to 001.2004 every time you change the scorecard or any of its elements!

Change Period

Video

To watch in fullscreen, click the fullscreen icon in the video. You can also download this video in *.avi format (resolution 1024x768).

 

<--- Previous Section | Next Section --->